Skip to content

Partial Replacement of Cement with Fly Ash and GGBS in M25 Concrete

Experimental study of strength and cost using industrial by-products.

Difficulty
Intermediate
Build time
8 weeks
Tech stack
Concrete lab, IS 10262 mix design, Excel
Team size
2–4 students
What's included
  • Complete source / working model
  • Project report in your college format
  • PPT for review & viva
  • Step-by-step setup guidance
  • Mentor support till your review
About this project
Cement production is a major source of CO₂. This project casts M25 concrete specimens replacing 10–40% of cement with fly ash and GGBS, tests compressive, split tensile and flexural strength at 7, 14 and 28 days, and compares strength, workability and cost with conventional concrete to find the optimum mix.
Modules
  1. 1 Mix design IS 10262 mix design and material tests.
  2. 2 Casting & testing Cubes, cylinders, prisms tested at 7/14/28 days.
  3. 3 Analysis Strength-vs-replacement graphs and cost comparison.
Viva preview

Questions examiners ask on this project. Guided build students practise the full set with a mentor.

Q1Why does fly ash gain strength slowly?
Q2What is the role of GGBS in durability?
Q3How did you choose the optimum replacement percentage?
Free

Get the abstract

We'll email it to you right away.

Book

Book this project

A mentor calls you within one working day to confirm scope, price and timeline. You pay after that call.