Skip to content
Mentor-guided Instrumentation Automation Hardware kit

Level and Flow Control using PLC and SCADA

Automates a two-tank process with alarms and trends on SCADA.

Difficulty
Intermediate
Build time
5 weeks
Tech stack
Siemens/Delta PLC, SCADA, level and flow sensors
Team size
2–4 students
What's included
  • Complete source / working model
  • Project report in your college format
  • PPT for review & viva
  • Step-by-step setup guidance
  • Mentor support till your review
About this project
A PLC controls a pump and valves to maintain tank level using level and flow sensors, while a SCADA screen shows mimic diagrams, trends, alarms and manual override. Ladder logic and HMI design are documented.
Modules
  1. 1 Ladder logic Sequences and interlocks
  2. 2 SCADA Mimic, trends and alarms
  3. 3 Testing Fault simulation
Viva preview

Questions examiners ask on this project. Guided build students practise the full set with a mentor.

Q1What is the difference between PLC and SCADA?
Q2Explain an interlock in your logic.
Q3How are analog signals scaled?
Free

Get the abstract

We'll email it to you right away.

Book

Book this project

A mentor calls you within one working day to confirm scope, price and timeline. You pay after that call.